Our team fabricated and erected 45 tonnes of structural steel in 41 days with no lost-time incident.
The 40 × 20 m portal-frame shed was erected bay by bay while one lane of the yard stayed open for coil traffic. The joint inspection was signed on the first walk.
All news




